The BMS Project

II. PLAY SAFE 2DAY PROGRAM

The Play Safe 2Day Program comes in two options.  Option One involves handing out a single, two-sided sheet, titled “SAFETY AND WELL-BEING RESOURCE GUIDE”.  The front of the Guide provides safety and well-being messaging, along with our Top Three Athlete Tips.  The back of the sheet will provide an introduction to theBMSproject.org.  The back of the sheet on Option Two will provide either an introduction to theBMSproject.org or an early season team pledge.  Additionally, in 2025, for teams it is anticipated that a mid & postseason cell phone conducted Play Safe 2Day Survey will be offered.  Finally, for individual events “Help a Friend 2Day” stickers on a roll will be available for individual events.  For team events stickers printed on sheets will be made available.

Option One – ” INDIVIDUAL PARTICIPANTS’ ” (2024)

(Camps, Clinics & Group/Mass Distribution)

Option Two –  “TEAM EVENTS PROGRAMS” (2025)

(Tournaments)

Option One – ” INDIVIDUAL PARTICIPANTS’ ” (2024)

Camps, Clinics & Group/Mass Distribution

Option Two –  “TEAM EVENTS PROGRAMS” (2025)

Tournaments