The BMS Project

Go-OkieDokie! 2023 5K Walk/Run Youth T-Shirt

$23.63

SKU: N/A Category:
XS S M L XL
Width, in 15.25 16.00 17.00 18.00 19.50
Length, in 20.00 21.50 23.00 25.00 27.00
Sleeve Length, in 12.50 13.50 14.50 15.50 16.50

Made for sports, play, and the active teen lifestyle. The Sport-Tek® Competitor™ Tee brings breathability, agility, and moisture-wicking properties to the table, making the perfect choice for active kids and school life. Made with 100% lightweight polyester that is soft to the tag, each tee features set-in sleeves and removable tags for total comfort at all times.

.: Material: 100% moisture wicking polyester
.: Extra light fabric (3.8 oz/ yd² (129 g/m²))
.: Athletic fit
.: Tear-away label

Weight N/A

Reviews

There are no reviews yet.

Be the first to review “Go-OkieDokie! 2023 5K Walk/Run Youth T-Shirt”

Your email address will not be published. Required fields are marked *