
HOW WE DO IT TOGETHER PROGRAMS
(2024 - 2025)
theBMSproject offers four distinct programs: “Children,” “Adolescents,” “Teens” and “Adults/Elite Athletes.” Our Children’s program focuses on literacy and child safety and well-being. The Adolescents program focuses on positive, supportive adult behavior. The Four Pillars Teens’ program stresses mental health and suicide prevention. Our 2025 Adults/Athletes program will focus on both physical and the mental stresses that older/elite athletes face. Our full spectrum of programs contribute to the safety and well-being of athletes of all ages. We view youth sports as a portal into communities at-large; thereby our services and resources are equally applicable to non-athletes. Together… here for our youth!
I. COMMUNITY OUTREACH (2024)
Option One – “EVENT ORGANIZERS”
Tournaments
• Electronically distributed two-sided version of Top Three Athlete Tips and The BMS Project Introduction on the reverse side
• Our logo on Affiliate’s home page linking to “By Sport” Directories hosted on our site and/or directly to our website
• “Help a Friend 2Day” home printed, non-weather resistant stickers on paper Avery #5160 Labels
Option Two – “SMALL GROUPS, TEAM ORGANIZATIONS & TEAMS” (2024)
Athlete Safety & Well-Being Four Pillars
• I. Introduction – Distributed two-sided, team discussion of Top Three Athlete Tips and The BMS Project Introduction on the reverse side
• II. Early-season Pledge – Two-sided Top Three Athlete Tips with team pledge on the reverse side
• III. Mid & Postseason Surveys – Two-sided description and example of Athlete safety and well-being surveys
• IV. “Help a Friend 2Day” – Home printed or vinyl stickers
Website / Group Presentations
• Our logo on Affiliate’s home page linking to “By Sport” Directories hosted on our site and/or directly to our website
• 30 Minute Zoom Coaches’, Parents, Athletes and/or Officials presentations seminars ($100 fee)
• One hour large group presentation ($350 per topic, plus travel & printing expenses)
Option Three – “COMMUNITY GROUP PRESENTATIONS”
• Electronically distributed two-sided version of Top Three Athlete Tips and The BMS Project Introduction on the reverse side
• Two hour — large group – multiple presentations ($600 plus travel & printing expenses)
• “Help a Friend 2Day” home printed, non-weather resistant stickers on paper Avery #5160 Labels
II. PLAY SAFE 2DAY
Option One – “INDIVIDUAL PARTICIPANTS’ EVENTS” (2024)
Camps, Clinics & Mass Distribution
• Electronically distributed two-sided version of Top Three Athlete Tips and The BMS Project Introduction on the reverse side
• “Help a Friend 2Day” home printed, non-weather resistant stickers on paper Avery #5160 Labels
Option Two – “TEAM EVENTS” (2024-2025)
Tournaments
• Early Season Team Discussion handout (*Two sided sheet) (Front — Top Three Athlete Tips) (2024)
• Early Season Team Pledge handout (*Two sided sheet) (Reverse – Team Season Behavior Pledge) (2024)
* Either side of the Early Season 2-Sided Handout sheet can be copied and be used separately, or not at all
• Mid & post season cell phone surveys (anonymously measures & reports aggregated team attitudes and emotional pulse (2025)
• “Help a Friend 2Day” All-Weather sticker program sheet to be cut apart and distributed (2025)
III. HELP A FRIEND 2DAY STICKERS
Option One – “PAPER PRINT AT HOME STICKERS” (2024)
• “Help a Friend 2Day” home printed, non-weather resistant stickers on paper Avery #5160 Labels
Option Two – “VINYL PRE-PRINTED STICKERS” (2025)
• Sheet of Cut Apart, vinyl Peel-Off Stickers
• On-a-Roll, vinyl Peel-Off Stickers
Note: BMS will be adding children programs for youngsters in 2025, as well as an elite athlete module.